ITCEN Group and AQUATRON AI-optimized data-center project visualization in South Korea
All projects
01FORMAL MOU

ITCEN Group × AQUATRON

AI-Optimized Data Center Collaboration — South Korea

Strategic MOU for an AI-optimized data-center concept built on direct-to-chip liquid cooling and integrated carbon capture.

Location
South Korea
Date
12 November 2024
Status
MOU signed
Classification
FORMAL MOU
Project Overview
LOCATION
South Korea
MILESTONE DATE
12 November 2024
CLASSIFICATION
FORMAL MOU
STATUS
MOU signed
CLAIM STATUS
Publicly Documented

Executive summary

On 12 November 2024, ITCEN Group and AQUATRON entered into a memorandum of understanding to collaborate on an AI-optimized data-center concept. The collaboration centres on direct-to-chip liquid cooling, very high rack densities and an integrated carbon-capture design, with captured carbon proposed for green-cement application. It sets out a shared vision for domestic and international project development. This engagement is a strategic collaboration under an MOU and is not presented as a commercial contract.

AQUATRON role

Technology and infrastructure collaboration partner, contributing the AI-optimized data-center concept, direct-to-chip liquid cooling and high-density rack capability.

Participants

01

ITCEN Group

Strategic collaboration partner

  • MOU counterparty
  • Domestic and international project-development vision

02

AQUATRON

Technology & infrastructure partner

  • AI-optimized data-center concept
  • Direct-to-chip liquid cooling
  • High-density rack design

Technology

The stack behind the work.

  • 01Direct-to-chip liquid cooling
  • 02AI-optimized data-center architecture
  • 03High-density racks
  • 04Carbon-capture design
  • 05Green-cement carbon utilisation

Published metrics

Expected PUE
1.051
PROJECT DESIGN TARGET
Source: ITCEN Group × AQUATRON MOU announcement
Stated rack capability
120 kW / rack
COMPANY REPORTED
Source: AQUATRON capability statement
Carbon-capture design target
95%
PROJECT DESIGN TARGET
Source: ITCEN Group × AQUATRON MOU announcement
Captured-carbon application
Green cement
PROPOSED APPLICATION
Source: ITCEN Group × AQUATRON MOU announcement

Timeline

  1. 2023

    AQUATRON founded

  2. 12 November 2024

    ITCEN Group × AQUATRON MOU

    AI-optimized data-center collaboration formalised.

  3. Next phase

    Project development

    Domestic and international development pathways under evaluation.

Evidence classification

Publicly Documented

Publicly Documented

Presented as an MOU / strategic collaboration. PUE, rack-density and carbon-capture figures are design targets and company statements, not operational results.

SOURCE
Public announcement of the ITCEN Group × AQUATRON MOU, 12 November 2024

Related projects

07PRODUCT PLATFORM

AQUATRON POD

Modular · Deployable globally · Product platform

Company-described modular, plug-and-play AI infrastructure platform with integrated power-to-compute architecture.

Company ReportedExplore AQUATRON POD