ITCEN Group × AQUATRON
AI-Optimized Data Center Collaboration — South Korea
Strategic MOU for an AI-optimized data-center concept built on direct-to-chip liquid cooling and integrated carbon capture.
- Location
- South Korea
- Date
- 12 November 2024
- Status
- MOU signed
- Classification
- FORMAL MOU
- LOCATION
- South Korea
- MILESTONE DATE
- 12 November 2024
- CLASSIFICATION
- FORMAL MOU
- STATUS
- MOU signed
- CLAIM STATUS
- Publicly Documented
Executive summary
On 12 November 2024, ITCEN Group and AQUATRON entered into a memorandum of understanding to collaborate on an AI-optimized data-center concept. The collaboration centres on direct-to-chip liquid cooling, very high rack densities and an integrated carbon-capture design, with captured carbon proposed for green-cement application. It sets out a shared vision for domestic and international project development. This engagement is a strategic collaboration under an MOU and is not presented as a commercial contract.
AQUATRON role
Technology and infrastructure collaboration partner, contributing the AI-optimized data-center concept, direct-to-chip liquid cooling and high-density rack capability.
Participants
01
ITCEN Group
Strategic collaboration partner
- MOU counterparty
- Domestic and international project-development vision
02
AQUATRON
Technology & infrastructure partner
- AI-optimized data-center concept
- Direct-to-chip liquid cooling
- High-density rack design
Technology
The stack behind the work.
- 01Direct-to-chip liquid cooling
- 02AI-optimized data-center architecture
- 03High-density racks
- 04Carbon-capture design
- 05Green-cement carbon utilisation
Published metrics
- Expected PUE
- 1.051
- PROJECT DESIGN TARGET
- Source: ITCEN Group × AQUATRON MOU announcement
- Stated rack capability
- 120 kW / rack
- COMPANY REPORTED
- Source: AQUATRON capability statement
- Carbon-capture design target
- 95%
- PROJECT DESIGN TARGET
- Source: ITCEN Group × AQUATRON MOU announcement
- Captured-carbon application
- Green cement
- PROPOSED APPLICATION
- Source: ITCEN Group × AQUATRON MOU announcement
Timeline
2023
AQUATRON founded
12 November 2024
ITCEN Group × AQUATRON MOU
AI-optimized data-center collaboration formalised.
Next phase
Project development
Domestic and international development pathways under evaluation.
Evidence classification
Publicly Documented
Publicly DocumentedPresented as an MOU / strategic collaboration. PUE, rack-density and carbon-capture figures are design targets and company statements, not operational results.
- SOURCE
- Public announcement of the ITCEN Group × AQUATRON MOU, 12 November 2024
- SOURCE LINKS
- ITCEN Group and AQUATRON sign MoU — DCD
Related projects
KORAIL × Supermicro × AQUATRON
Seoul, South Korea · 16 December 2025
Three-party agreement to build a railway-AI testbed around an NVIDIA GB300-based Super AI Station.
AQUATRON POD
Modular · Deployable globally · Product platform
Company-described modular, plug-and-play AI infrastructure platform with integrated power-to-compute architecture.
Global Deployment Footprint
4 continents · Portfolio reference
Two separate portfolio references, for two different entities and scopes, that are never added together.
Collaborate
Discuss this project with AQUATRON.
Infrastructure collaboration, technology partnership and sovereign-AI discussions are welcome.